REBUILDING SOUTHERN RAIL BATTLE of BRITAIN CLASS PACIFIC No. 34059 SIR ARCHIBALD SINCLAIR This project was part of the Big Give Christmas Challenge 2012. Thank you to hundreds of people who made a donation. Sadly we did not reach our target and still need £10,000 to complete the restoration.

history Campaign has now closed

It ran from 10:00 AM, 6 December 2012 to 5:00 PM, 19 December 2012

Registered Charity in England and Wales (292497)

Check mark Match funded

Campaign target

£45,000

Amount raised

£44,551

Donations

314

    Category

  • Arts/Culture/HeritageArts/Culture/Heritage
  • Sports/RecreationSports/Recreation

    Helping

Location

  • It is such a great honour to know that this tribute to my grandfather‚Äôs wartime service is being preserved for the public good

    — The Viscount John Thurso

  • It is such a great honour to know that this tribute to my grandfather’s wartime service is being preserved for the public good

    — The Viscount John Thurso

Situation

The locomotive was restored to service from scrap yard condition in 2009, but after about 18 months use it developed cracks in part of the firebox which had not been replaced during the overhaul because tests had showed it to be sound. It would have been possible to continue repairing small areas, but that type of repair would not last long because the material is now found to be life-expired. Replacement of all of the remaining old material will give the locomotive a good service life.

Solution

The main work will include new Thermic Syphon parts, and replacement of both lower sides of the inner firebox up to the height of the brick arch. The Centre part of the crown sheet will also be replaced with possibly the top corner sections (where the sides join the crown sheet). The work will require the boiler to be taken out of the frames, and it is estimated the repair will take up to 9 months.